Atomic Eagle Uranium Development
One of 2,237 projects Taiyo tracks in Zambia.
Source: Discovery Alert
The Atomic Eagle uranium development project in Zambia has expanded its resource base to 58.8 million pounds of triuranium octoxide at 309 ppm. The project targets production start in 2026 and utilizes open-pit, heap leach processing with high recovery rates. It benefits from Zambia's established mining infrastructure and regulatory framework, aiming for a 12-year mine life with a production capac
- Status
- Prospective
- Sector
- Nuclear
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- Discovery Alert
ConstructChat
Ask ConstructChat about Atomic Eagle Uranium Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Atomic Eagle uranium development project in Zambia has expanded its resource base to 58.8 million pounds of triuranium octoxide at 309 ppm. The project targets production start in 2026 and utilizes open-pit, heap leach processing with high recovery rates. It benefits from Zambia's established mining infrastructure and regulatory framework, aiming for a 12-year mine life with a production capacity of 2.2 million pounds annually in the base case. |
Original sector | Mining |
Budget |
Location
Country | Zambia |
Source
Source | Discovery Alert |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
