ATOPs Headquarters Office Construction
Sector: Power Generation (CCGT) • Location: Wheat Ridge, Colorado, United States of America
Source: Dodge USA
Solicitation for a contractor to build additional office space for supervisors and flex office space for staff at our leased facility in Wheat Ridge. The construction project will modify existing office space within our leased facility to build four additional offices. This work will include the addition of new walls, modified and new electrical work, as well as modification to the existing HVAC a
- Status
- Closed
- Sector
- Power Generation (CCGT), Warehouse, Residential, Commercial, Consumer Products, Manufacturing (Industrial)
- Location
- Wheat Ridge, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ATOPs Headquarters Office Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Solicitation for a contractor to build additional office space for supervisors and flex office space for staff at our leased facility in Wheat Ridge. The construction project will modify existing office space within our leased facility to build four additional offices. This work will include the addition of new walls, modified and new electrical work, as well as modification to the existing HVAC and fire suppression systems. Additionally, two new offices will be built in the warehouse space t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Wheat Ridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Warehouse, Residential, Commercial, Consumer Products, Manufacturing (Industrial) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
