Atwood Town - ARPA Water System Improvements
Sector: Water Supply and Storage • Location: Atwood, Tennessee, United States of America
Source: Dodge
The scope of work consists of the following: The replacement of existing 2 water line with approximately 4,400 LF of 8 PVC water line. Installation of two (2) fire hydrant assemblies. Site work including grading, drainage, pressure testing, disinfection, asphaltic paving and concrete sidewalks, and fencing. All electrical and controls wiring to fully complete the system; Local and Master control p
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission, Commercial, Car parking, Automotive
- Location
- Atwood, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Atwood Town - ARPA Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work consists of the following: The replacement of existing 2 water line with approximately 4,400 LF of 8 PVC water line. Installation of two (2) fire hydrant assemblies. Site work including grading, drainage, pressure testing, disinfection, asphaltic paving and concrete sidewalks, and fencing. All electrical and controls wiring to fully complete the system; Local and Master control panel modifications and programming; Any/All other work which could be considered incidental to co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Atwood |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission, Commercial, Car parking, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
