logo

Auburn Avenue Historic and Cultural Information Project

Sector: Bridge • Location: Georgia, United States of America (USA)

Source: Atlanta

Project
Ongoing

The Auburn Avenue Historic and Cultural Information Project includes two major components: The installation of (21) new interpretive and (4) gateway signs along Auburn Avenue between Peachtree Street and Boulevard. A large scale (270’ W x 22’ H) mural enhancement to the existing bridge underpass at Auburn Avenue and Interstate 75/85. The 21 new interpretive signs and 4 gateway signs, designed by S

Project Information FAQ

Project Information

4 Q
The project “Auburn Avenue Historic and Cultural Information Project” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Auburn Avenue Historic and Cultural Information Project includes two major components: The installation of (21) new interpretive and (4) gateway signs along Auburn Avenue between Peachtree Street and Boulevard. A large scale (270’ W x 22’ H) mural enhancement to the existing bridge underpass at Auburn Avenue and Interstate 75/85. The 21 new interpretive signs and 4 gateway signs, designed by Sky Design, have replaced previous interpretive signs installed by the Corporation of Olympic Development in Atlanta (CODA) in 1995. Sign content was developed in partnership with project historian Dr. Karcheik Sims-Alvarado. The mural enhancement features large scale images of historic buildings, landmarks, and cultural institutions which exist or previously existed along Auburn Avenue. The mural design team was led by husband and wife Ron Huffman (of Wood PLC) and Therese Huffman (of Signature Design). Project elements were fabricated and installed by DeNyse Companies, and the underpass lighting elements were installed by Brooks Berry Haynie & Associates. Made possible by Transportation Enhancement (TE) funding from the Georgia Department of Transportation (GDOT) and funding from CAP/ADID, the project enhances the aesthetic quality of the existing bridge infrastructure and the pedestrian experience along Auburn Avenue, all while reflecting the unique history and culture of the surrounding community. The project’s advisory team – without whom the project would not have been possible – was comprised of several community organizations and neighborhood leaders who guided the project’s overall design and served as content editors.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data