logo
ProjectOngoing

Auburn Avenue Historic and Cultural Information Project

The status, timeline and source of this project. A free account opens every field.

Source: Atlanta

The Auburn Avenue Historic and Cultural Information Project includes two major components: The installation of (21) new interpretive and (4) gateway signs along Auburn Avenue between Peachtree Street and Boulevard. A large scale (270’ W x 22’ H) mural enhancement to the existing bridge underpass at Auburn Avenue and Interstate 75/85. The 21 new interpretive signs and 4 gateway signs, designed by S

Status
Under Construction
Sector
Bridge, Commercial, Consumer Products, Manufacturing (Industrial), Tunnel, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta

ConstructChat

Ask ConstructChat about Auburn Avenue Historic and Cultural Information Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Auburn Avenue Historic and Cultural Information Project” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta.

Participants

Sponsoring Agency

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Auburn Avenue Historic and Cultural Information Project includes two major components: The installation of (21) new interpretive and (4) gateway signs along Auburn Avenue between Peachtree Street and Boulevard. A large scale (270’ W x 22’ H) mural enhancement to the existing bridge underpass at Auburn Avenue and Interstate 75/85. The 21 new interpretive signs and 4 gateway signs, designed by Sky Design, have replaced previous interpretive signs installed by the Corporation of Olympic Development in Atlanta (CODA) in 1995. Sign content was developed in partnership with project historian Dr. Karcheik Sims-Alvarado. The mural enhancement features large scale images of historic buildings, landmarks, and cultural institutions which exist or previously existed along Auburn Avenue. The mural design team was led by husband and wife Ron Huffman (of Wood PLC) and Therese Huffman (of Signature Design). Project elements were fabricated and installed by DeNyse Companies, and the underpass lighting elements were installed by Brooks Berry Haynie & Associates. Made possible by Transportation Enhancement (TE) funding from the Georgia Department of Transportation (GDOT) and funding from CAP/ADID, the project enhances the aesthetic quality of the existing bridge infrastructure and the pedestrian experience along Auburn Avenue, all while reflecting the unique history and culture of the surrounding community. The project’s advisory team – without whom the project would not have been possible – was comprised of several community organizations and neighborhood leaders who guided the project’s overall design and served as content editors.

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Consumer Products, Manufacturing (Industrial), Tunnel, Road, Government

Article published date

2023-12-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project