Auburn Boulevard Arcade Creek Bridge Replacement
Sector: Water Supply and Storage • Location: Sacramento, California, United States of America
Source: Dodge
This project provides for, in general, replacing the existing bridge along Auburn Boulevard over Arcade Creek, adjacent Winding Road intersection improvements, addition of second dedicated left turn lane from Auburn Boulevard to Winding Way, construction of single span precast prestressed girder bridge, bridge foundations, approach roadway, curb, gutter, and sidewalk, curb ramps, re-striping, inst
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Wind, Bridge, Manufacturing (Industrial), Car parking, Commercial, Waste Processing and Treatment, Road, Automotive
- Location
- Sacramento, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Auburn Boulevard Arcade Creek Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides for, in general, replacing the existing bridge along Auburn Boulevard over Arcade Creek, adjacent Winding Road intersection improvements, addition of second dedicated left turn lane from Auburn Boulevard to Winding Way, construction of single span precast prestressed girder bridge, bridge foundations, approach roadway, curb, gutter, and sidewalk, curb ramps, re-striping, installation of water line, installation of casing for PG&E gas line, installing new drainage, instal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Sacramento |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Wind, Bridge, Manufacturing (Industrial), Car parking, Commercial, Waste Processing and Treatment, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
