logo

AUGMENTATION OF CHEBARA WATER SUPPLY PROJECT

Sector: Hydro • Location: Nairobi, Kenya

Source: eOpportunities Kenya

Project
Sites Identified

The specific objective of this project therefore is to improve the transmission capacity of Chebara-Kapsoya transmission mainline so as to be able to evacuate the full design potential of the treatment works of 28,000 m3/day and determine the capability of the treatment plant to treat the 34,000m3/day maximum outflow from the dam. This will be achieved by laying a DN 600 new parallel HDPE pipeline

Project Information FAQ

Project Information

4 Q
The project “AUGMENTATION OF CHEBARA WATER SUPPLY PROJECT” is an infrastructure initiative in the Hydro sector, located in Nairobi, Kenya. Taiyo aggregates data on it from eOpportunities Kenya.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

sites identified

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The specific objective of this project therefore is to improve the transmission capacity of Chebara-Kapsoya transmission mainline so as to be able to evacuate the full design potential of the treatment works of 28,000 m3/day and determine the capability of the treatment plant to treat the 34,000m3/day maximum outflow from the dam. This will be achieved by laying a DN 600 new parallel HDPE pipeline from CH 0+ 00 to CH 3 + 300, Construction of an aeration chamber at Chebara treatment plant and DN 500 new parallel HDPE pipeline from CH 37+ 102 to Munyaka Centre. Eldoret town and its environs has a current demand of 60,000m3/day while the water produced is only 43,000m3/day which has led to cases of intermittent water supply. The existing sources are from Chebara 23,000m3/day and Ellegerini-Kapsoya has a capacity of 9,000m3/day while Sosiani has a capacity of 11,000m3/day. The proposed Augmentation works will improve water supply by an additional 5,000 m3/day which will serve to decrease the current demand as well as increase revenue for Eldoret Water and Sanitation Company (ELDOWAS). The estimated cost of the project is KES 467,587,858.65 which cover costs for construction and consultancy costs. Eldoret water & sanitation Company is seeking financing for the Augmentation of the Chebara Pipeline to be able to meet the water demand thereby contributing to Vision 2030 aspirations. ELDOWAS is therefore seeking for development partners to implement the project

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data