Augmented Reality (AR) for Infrastructure
Close · Global
Source: Ferrovial
Ferrovial Business Lines Projects Augmented Reality (AR) Global 2020 Project Date 4 Technologies Tested 7 3D Models Used Augmented Reality (AR) is the technology that supports the overlay of digital information on real-world elements. Augmented reality keeps the real world central but enhances it with digital information, such as equipment data or 3D models. We have been exploring the use cases
- Status
- Closed
- Sector
- Commercial, Consumer Products, Power Transmission, Rail, Airport, Power Generation (CCGT)
- Location
- World
- Updated
- 22 Jul 2026
- Source
- Ferrovial
ConstructChat
Ask ConstructChat about Augmented Reality (AR) for Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ferrovial Business Lines Projects Augmented Reality (AR) Global 2020 Project Date 4 Technologies Tested 7 3D Models Used Augmented Reality (AR) is the technology that supports the overlay of digital information on real-world elements. Augmented reality keeps the real world central but enhances it with digital information, such as equipment data or 3D models. We have been exploring the use cases and benefits of using Augmented Reality (AR) technology, including the Microsoft Hololens 2. A Proof of Concept (PoC) was performed using Hololens 2 to carry out remote site tours. Identified Cases for the Use of AR Technology Remote site visits, connecting remote sites to managers and directorsRemote assistance to technicians on siteOverlay of 3D models on site facilitating project coordination and progress reviews with clients and subcontractorsVisualize underground utilities to avoid any risks during excavation processTaking measures of project features and progressSafety training and introductionsVisualize asset operational data overlaid in reality and fill in information checklists In the PoC carried out in November 2020, the following use cases were successfully tested: Remote Site Tours A Virtual tour was carried out where the executive committee was able to perform a virtual visit to the Citrus project, a building construction project in Pozuelo de Alarcón Madrid. The tour was carried out using the Trimble XR10 hardware (Hololens 2 version for Construction) on site and the application of Microsoft Remote Assist in the Hololens, which is directly connected to Microsoft Teams. This use case is driven by the COVID-19 global situation and what used to be a frequent process of directors visiting our sites to undertake site tours, has proven very challenging in the last year with the restriction on contact and travel. While technology currently cannot fully replace this face to face experience, this project has proven that the use the HoloLens technology has the potential to at least partially replace the capability to connect and collaborate with our assets and contracts. Overlay of 3D models in reality Project 3D models where overlaid into the reality using Trimble Connect application for Hololens 2 and shared virtually with the remote assistants of the virtual tour. Visualizing the 3D models in a real-world scale can support the early identification of errors and support decision making. The lessons learned from this PoC include: Technology easily usable by a range of personnel without specific technical skillsGood audio capabilities of the technology to be used on construction sites (noise cancelling)Great capabilities of technology to overlay 3D models on site shows significant potential for driving multiple use casesOverlay of 3D models in reality only takes a couple of minutesNeed of 4G and/or WIFI connectivity on site to enable the use of this technology |
Original sector | Construction |
Location
Country | World |
Source
Source reliability | Medium |
Source | Ferrovial |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Power Transmission, Rail, Airport, Power Generation (CCGT) |
Article published date | 2023-06-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
