Augusta Bottom Road Bridge Replacement
Sector: Steel • Location: Saint Charles, Missouri, United States of America
Source: Dodge
The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to remove the existing bridge structure and construct an aluminum box culvert along with grading and asphalt paving in St. Charles County, Missouri. Augusta Bottom Road Bridge Project Material Testing Services
- Status
- Closed
- Sector
- Steel, Metal, Government, Road, Bridge, Commercial
- Location
- Saint Charles, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Augusta Bottom Road Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to remove the existing bridge structure and construct an aluminum box culvert along with grading and asphalt paving in St. Charles County, Missouri. Augusta Bottom Road Bridge Project Material Testing Services |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Saint Charles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Government, Road, Bridge, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
