Aukera BESS
Sector: Telecommunications • Location: Romania
Source: International Finance Corporation (IFC)
The proposed investment is an IFC loan of up to €136m in an up to €336m total debt financing for a greenfield portfolio of standalone battery energy storage systems (“BESS”) in Romania (“Project”) that is being developed by Aukera BV (“Sponsor” or “Aukera”). The Project will have an aggregate storage capacity of up to 1.9GWh for a total estimated Project cost of up to €450m. Stage I of the Project
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pending |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed investment is an IFC loan of up to €136m in an up to €336m total debt financing for a greenfield portfolio of standalone battery energy storage systems (“BESS”) in Romania (“Project”) that is being developed by Aukera BV (“Sponsor” or “Aukera”). The Project will have an aggregate storage capacity of up to 1.9GWh for a total estimated Project cost of up to €450m. Stage I of the Project comprises two ready-to-build BESS assets in Gura Ialomitei in South-East Romania. Stage II involves three additional BESS assets spread across locations along the country’s North-East to South-East nodes in Dumbrava, Roman, and Lacu Sarat. Aukera has secured lease agreements with landowners and has obtained rights of way for grid connections, where necessary.The works required at each of the BESS sites include site preparation and laying of foundations and internal roads, the installation of batteries and control facilities, installing the 33kV/110kV transformer substation and trenching the cable route to connect to the grid via underground cabling. Once operational, the systems will be fully automated. Construction of the first BESS asset in Stage I commenced in October 2025 and is scheduled to be completed by mid-2026, with the second asset in Stage I due for completion and start of commercial operations by the end of 2026.Stage I has a planned capacity of 250MW (500 MWh), with a total site area of 38,700m² lying approximately 500m from the outskirts of Gura Ialomitei. For Stage II, the Dumbrava site has a planned capacity of 200MW (400MWh) and is situated in the Savinesti Commune adjacent to the Dumbrava substation on the northern edge of the village of Dumbrava-Deal, on a 27,000m² plot approximately 4km north of the town of Roznov. The Roman site (capacity 200MW / 400MWh) is located on a 50,000m² plot approximately 350m from the substation on the northern outskirts of Roman, a municipality in Neamt County, northeastern Romania. The Lacu Sarat site (capacity 300MW / 600MWh) in Braila County is on a 35,000 m² plot approximately 1.5km east of Tudor Vladimirescu Commune and 1.2km northwest of the Lacu Sarat substation.Aukera is an emerging BESS and renewable energy developer with a footprint in Romania since 2021. The company has a ~14.6GW pipeline, with 6.5GW in projects at an advanced stage of development and 810 MW under construction across Romania, UK, Italy, and Germany.The EPC (Engineering, Procurement, and Construction) contractor has been selected and contracted for Stage I. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |