Auntha-Simaria Bridge Project
The status, timeline and source of this project. A free account opens every field.
Source: News24
An 8.15 km long bridge located on NH-31, including a 1.86 km long six-lane bridge costing over Rs 1,870 crore. It connects Mokama in Patna to Begusarai and improves connectivity by reducing the detour for heavy vehicles caused by the old two-lane rail-road bridge Rajendra Setu.
- Status
- Closed
- Sector
- Mass Transit, Road, Automotive, Rail, Bridge
- Location
- Gaya, Bihar, India
- Updated
- 22 Jul 2026
- Source
- News24
ConstructChat
Ask ConstructChat about Auntha-Simaria Bridge Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An 8.15 km long bridge located on NH-31, including a 1.86 km long six-lane bridge costing over Rs 1,870 crore. It connects Mokama in Patna to Begusarai and improves connectivity by reducing the detour for heavy vehicles caused by the old two-lane rail-road bridge Rajendra Setu. |
Original sector | Infrastructure |
Budget |
Location
Country | India |
State | Bihar |
City | Gaya |
Source
Source | News24 |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Automotive, Rail, Bridge |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project