Aura Solar II Power Project

Sector: Solar • Location: Honduras

Source: World Bank Group

Project
Active

Corporacion Aura Solar, a subsidiary of the Mexican company Gauss Energia, announced the development of the Aura Solar II power plant at Choluteca, Honduras (61 MW in capacity). The sponsors signed a 20-year PPA with the state-owned company ENEE.

The sponsor created the special purpose company Energia Cinco Estrellas S.A. de C.V. to manage the project. Investment was estimated at US$ 120 million.

Project Information FAQ

Project Information

4 Q
The project “Aura Solar II Power Project” is an infrastructure initiative in the Solar sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Corporacion Aura Solar, a subsidiary of the Mexican company Gauss Energia, announced the development of the Aura Solar II power plant at Choluteca, Honduras (61 MW in capacity). The sponsors signed a 20-year PPA with the state-owned company ENEE. The sponsor created the special purpose company Energia Cinco Estrellas S.A. de C.V. to manage the project. Investment was estimated at US$ 120 million. Financial closure was achieved in March 2013, when the sponsor was granted a US$ 26.35 million financing package from the IFC (US$ 1.35 million - risk management; US$ 25 million - loan). Bancomext and the German development bank DEG also provided financing to the project (US$ 45.5 million each institution). The Spanish company Isolux-Corsan was responsible for the engineering, procurement and construction (EPC) of the plant. Operations commenced in August 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data