logo
ProjectCompleted

Aura Solar

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The Aura Solar Project (the “Project” or “Aura”) comprises the construction and operation of a 38.6 MWdc (30MWac) greenfield photovoltaic power plant on an area of 100 ha to be located 10 km from La Paz, Baja California Sur (“BCS”), Mexico. The Project includes the construction of a 2.8 km-long transmission line. Aura is being developed by Gauss Energía (“Gauss”), an independent Mexican energy con

Status
Closed
Sector
Raw Materials, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Natural Gas, Government
Location
Mexico
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Aura Solar

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Aura Solar” is an infrastructure initiative in the Raw Materials sector, located in Mexico. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Aura Solar Project (the “Project” or “Aura”) comprises the construction and operation of a 38.6 MWdc (30MWac) greenfield photovoltaic power plant on an area of 100 ha to be located 10 km from La Paz, Baja California Sur (“BCS”), Mexico. The Project includes the construction of a 2.8 km-long transmission line. Aura is being developed by Gauss Energía (“Gauss”), an independent Mexican energy consultancy/developer and will be 100% owned by Corporacion Aura Solar, (“CAS”). The Project will be constructed and operated under an EPC contract with an experienced engineering firm and PV panels will be supplied by a top-class PV manufacturer. Construction will last approximately 8 months and Aura is expected to be commissioned by August 2013.Mexican sole power utility CFE will act as off-taker of the Project under a 20-year  take-and-pay and will pay Aura Solar the applicable Short Term Marginal Cost or “Costo Total de Corto Plazo” at the La Paz node. Aura is the first private utility scale project to be developed under this framework and the largest PV solar plant to be built to date in Mexico.The Project will contribute to increase the share of clean and renewable energy in Mexico, specifically in BCS, an area mainly powered by fossil fuel generation.

Original sector

V-BF - Solar - Renewable Energy Generation

Budget

Location

Country

Mexico

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Power Transmission, Power Generation (CCGT), Solar, Water Supply and Storage, Natural Gas, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project