logo
ProjectUnder Implementation

AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km

The status, timeline and source of this project. A free account opens every field.

Source: India Investment Grid (IIG)

Information South Central Railway [SCR] - II has come up with AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km with a ticket size of 960.64 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The proposed doubling between Aurangabad Ankai will be an alternate route to r

Status
Prospective
Sector
Mass Transit, Steel, Manufacturing (Industrial), Rail, Seaport, Road, Government, Metal
Location
Aurangabad, Maharashtra, India
Updated
19 Nov 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km” is an infrastructure initiative in the Mass Transit sector, located in Aurangabad, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

under implementation

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Information South Central Railway [SCR] - II has come up with AURANGABAD-ANKAI - DOUBLING PROJECT 98.25 Km with a ticket size of 960.64 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The proposed doubling between Aurangabad Ankai will be an alternate route to reach to the long destinations like Mumbai New Delhi Amritsar from Bangalore Hyderabad Nizamabad etc as most of the long distance passenger and express trains are passing on this route. Present Line Capacity is 114 and projected to be 143 in 2028 on completion of project. Proposed doubling will improve Goods and Passenger traffic on this single line. Also there is huge untapped potential of Freight Traffic from the nearby Industrial Clusters Proposed doubling is on very important section having Road connectivity with State and National Highways running parallel to Two Economic Corridors connecting Mumbai Igatpuri Nashik Aurangabad Badnera and Pune Ahmednagar Aurangabad Jalna Nanded. A new Dry Port is being setup by IPRCL at Dinagaon which is 55 Km from Aurangabad. This will be operational in December 2022. Railway is also planning to develop Goods shed at same station to cater growing demand of Steel Industry available nearby. Railway is planning to provide Two More Goods loading/unloading lines at Dinagaon to capture the incoming raw material and outgoing finished product from the Steel Industry located in that area. The incoming material will be coming via Manmad Aurangabad section and this doubling is very crucial for augmenting this goods traffic.

Original sector

Railways

Procurement method

Budget

Location

Country

India

State

Maharashtra

City

Aurangabad

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Mass Transit, Steel, Manufacturing (Industrial), Rail, Seaport, Road, Government, Metal

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project