Aurangabad-Jalna-Jintur Project on MSH-6
Sector: Automotive • Location: Benue, India
Source: World Bank Group
In December 2007, the Public Works Department (PWD) of the Government of Maharashtra (GoM) signed a 20 year concession contract to a consortium formed by India’s Sadbhav Engineering Ltd. and PBA Infrastructure Ltd. to widen and strengthen the 66 km section on the State Highway 6 (SH6) between Aurangabad and Jalna, in the state of Maharashtra.
Under the contract, the consortium was responsible f
- Status
- Prospective
- Sector
- Automotive, Government, Road, Commercial
- Location
- Benue, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Aurangabad-Jalna-Jintur Project on MSH-6
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2007, the Public Works Department (PWD) of the Government of Maharashtra (GoM) signed a 20 year concession contract to a consortium formed by India’s Sadbhav Engineering Ltd. and PBA Infrastructure Ltd. to widen and strengthen the 66 km section on the State Highway 6 (SH6) between Aurangabad and Jalna, in the state of Maharashtra. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and widening of the existing two-lane highway to a four-lane highway with paved shoulders. The expansion project, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium established Aurangabad-Jalna Tollway Ltd. (AJTL), a special purpose vehicle, to implement the project. The consortium won the tender through competitive bidding, conducted by Maharashtra PWD. While the bidding details were not know at the time of collection of information, it is known that AJTL was to recover the capital costs and operating costs including returns through tolling during the concession period. The project reached financial closure in December 2007. The total capital cost of the project was estimated at US$ 74.25 million. Construction on the project began in Dec 2007 and was expected to be completed by mid 2009. www.projectstoday.com www.pppinindia.com http://www.moneycontrol.com/stocks/company_info/chairmans_speech.php?sc_did=PBA |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
State | Benue |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Government, Road, Commercial |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in India
- Mundra Ultra Mega Power Plant Gujarat
- Dholera Solar Park Gujarat
- ONGC Tripura Power Plant
- Tuppadahalli Wind Farm
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
