logo

Aurora Powerhouse Project

Sector: Power Generation (CCGT) • Location: Idaho, United States

Source: TechStock²

Project
Planned

Oklo Inc. is developing the Aurora powerhouse project in Idaho, which involves building advanced nuclear power plants. The project has cleared an early regulatory hurdle with the U.S. Nuclear Regulatory Commission's approval of its Principal Design Criteria topical report, which outlines baseline safety, reliability, and performance standards. Oklo aims to build, own, and operate these powerhouses

Status
Prospective
Sector
Power Generation (CCGT), Nuclear, Commercial
Location
Idaho, United States of America
Updated
22 Jul 2026
Source
TechStock²

ConstructChat

Ask ConstructChat about Aurora Powerhouse Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Aurora Powerhouse Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Idaho, United States. Taiyo aggregates data on it from TechStock².

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Oklo Inc. is developing the Aurora powerhouse project in Idaho, which involves building advanced nuclear power plants. The project has cleared an early regulatory hurdle with the U.S. Nuclear Regulatory Commission's approval of its Principal Design Criteria topical report, which outlines baseline safety, reliability, and performance standards. Oklo aims to build, own, and operate these powerhouses and sell the electricity generated.

Original sector

Energy

Location

Country

United States of America (USA)

State

Idaho

Source

Source

TechStock²

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Nuclear, Commercial

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project