logo
ProjectClosed

Ausgrid Power2U Project

The status, timeline and source of this project. A free account opens every field.

Source: Australian Renewable Energy Agency (ARENA)

The Ausgrid Power2U project involves the establishment a $4.1 million fund to help selected customers to permanently reduce their electricity use on Ausgrid’s network. By permanently reducing customer demand for grid supplied electricity, Ausgrid can delay, or avoid, network investment and, over time, lower the cost of electricity for all customers.Key resultsAusgrid’s project aimed to incentivise

Status
Closed
Sector
Power Generation (CCGT), Solar, Stadium, Government, Manufacturing (Industrial)
Location
Australia
Updated
22 Jul 2026
Source
Australian Renewable Energy Agency (ARENA)

ConstructChat

Ask ConstructChat about Ausgrid Power2U Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ausgrid Power2U Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ausgrid Power2U project involves the establishment a $4.1 million fund to help selected customers to permanently reduce their electricity use on Ausgrid’s network. By permanently reducing customer demand for grid supplied electricity, Ausgrid can delay, or avoid, network investment and, over time, lower the cost of electricity for all customers.Key resultsAusgrid’s project aimed to incentivise and encourage households and businesses to adopt energy efficiency measures such as installing new solar power systems and LED lighting upgrades to defer a replacement driven capital project. The program targeted customers in the Canterbury-Bankstown and City of Sydney areas. The project achieved sales (totalling 3,233 kW PV systems) and demonstrated it may be cost-effective to offer incentives to encourage additional uptake of customer PV systems, in particular for the business customer segment. The COVID-19 restrictions also created challenges and restricted the level of PV system installations. Ausgrid estimated that about 40-75% (or 1300-2400 kW of the total program installs) are additional to the business as usual activity. However, the results reaffirmed that a blend of non-network and partial network solutions may be required.

Budget

Location

Country

Australia

Source

Source reliability

High

Source

Australian Renewable Energy Agency (ARENA)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Stadium, Government, Manufacturing (Industrial)

Article published date

2023-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project