Austin Parkway West Drainage Modifications
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Replace drainage system from Ditch C-1 in Fort Bend LID 2 to East of Mesquite Dr. The project is connected to the Chimneystone drainage channel and it aims to reduce the depth and duration of ponding in the area during rainfall events.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Raw Materials, Commercial, Road
- Location
- Sugar Land, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Austin Parkway West Drainage Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace drainage system from Ditch C-1 in Fort Bend LID 2 to East of Mesquite Dr. The project is connected to the Chimneystone drainage channel and it aims to reduce the depth and duration of ponding in the area during rainfall events. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sugar Land |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Raw Materials, Commercial, Road |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
