Austin Pond WWPS Modifications
Sector: Power Generation (CCGT) • Location: Clayton, North Carolina, United States of America
Source: Dodge USA
The Project includes the following Work: Modifications include the addition of a second wet well connected to and adjacent to the existing wet well with two (2) submersible pumps and a second valve vault along with two (2) flow meters and associated meter vaults, new influent manhole and channel grinder, new electrical rack and generator sized for new electrical loading, and modification to the Wi
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Clayton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Austin Pond WWPS Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Modifications include the addition of a second wet well connected to and adjacent to the existing wet well with two (2) submersible pumps and a second valve vault along with two (2) flow meters and associated meter vaults, new influent manhole and channel grinder, new electrical rack and generator sized for new electrical loading, and modification to the Winston Pointe WWPS onsite force main discharge. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Clayton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
