Austin Pond WWPS Modifications
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
The Project includes the following Work: Modifications include the addition of a second wet well connected to and adjacent to the existing wet well with two (2) submersible pumps and a second valve vault along with two (2) flow meters and associated meter vaults, new influent manhole and channel grinder, new electrical rack and generator sized for new electrical loading, and modification to the Wi
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Clayton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Austin Pond WWPS Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Modifications include the addition of a second wet well connected to and adjacent to the existing wet well with two (2) submersible pumps and a second valve vault along with two (2) flow meters and associated meter vaults, new influent manhole and channel grinder, new electrical rack and generator sized for new electrical loading, and modification to the Winston Pointe WWPS onsite force main discharge. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Clayton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
