Autazes Power Transmission Line
Sector: Fertilizers • Location: Autazes, Amazonas, Brazil
Source: Mining.com
Development, permitting, construction, and operation of a 102-mile-long power transmission line to supply 300MW per year of 80% renewable-sourced electricity for the Autazes potash project. The project will be done through a build, own & transfer model, with Brazil Potash gaining ownership after 25 years of operation.
- Status
- Prospective
- Sector
- Fertilizers, Power Generation (CCGT)
- Location
- Autazes, Amazonas, Brazil
- Updated
- 22 Jul 2026
- Source
- Mining.com
ConstructChat
Ask ConstructChat about Autazes Power Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development, permitting, construction, and operation of a 102-mile-long power transmission line to supply 300MW per year of 80% renewable-sourced electricity for the Autazes potash project. The project will be done through a build, own & transfer model, with Brazil Potash gaining ownership after 25 years of operation. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Amazonas |
City | Autazes |
Source
Source | Mining.com |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Power Generation (CCGT) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
