logo

Auto Road Connector Detailed Design

Sector: Power Transmission • Location: Salmon Arm, British Columbia, Canada

Source: Dodge USA

Project
Closed

The design scope includes approximately 700 metres of urban arterial roadway (CoSA Standard Drawing No. RD-4, 25.0m dedication) through challenging topography and a crossing of a high-pressure Fortis gas corridor. The scope includes all structures and utilities necessary to facilitate construction of the roadway such as retaining walls and storm water collection systems as well as detailed design

Status
Closed
Sector
Power Transmission, Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Power Generation (CCGT)
Location
Salmon Arm, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Auto Road Connector Detailed Design

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Auto Road Connector Detailed Design” is an infrastructure initiative in the Power Transmission sector, located in Salmon Arm, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The design scope includes approximately 700 metres of urban arterial roadway (CoSA Standard Drawing No. RD-4, 25.0m dedication) through challenging topography and a crossing of a high-pressure Fortis gas corridor. The scope includes all structures and utilities necessary to facilitate construction of the roadway such as retaining walls and storm water collection systems as well as detailed design of all utilities necessary to service future development within the road corridor (storm, water, ...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Salmon Arm

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Power Generation (CCGT)

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project