logo

Autonomous All-Electric Train Cars by Parallel Systems

Sector: Rail • Location: United States

Source: The Cool Down

Project
Pilot Project Underway

Parallel Systems, in collaboration with the National Renewable Energy Laboratory (NREL), has developed autonomous all-electric train cars designed to improve freight delivery efficiency. These self-driving railcars can travel up to 500 miles on a single charge using existing rail lines and are equipped with sensors integrated into NREL's Advanced Locomotive Technology and Rail Infrastructure Optim

Project Information FAQ

Project Information

3 Q
The project “Autonomous All-Electric Train Cars by Parallel Systems” is an infrastructure initiative in the Rail sector, located in United States. Taiyo aggregates data on it from The Cool Down.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pilot project underway

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Parallel Systems, in collaboration with the National Renewable Energy Laboratory (NREL), has developed autonomous all-electric train cars designed to improve freight delivery efficiency. These self-driving railcars can travel up to 500 miles on a single charge using existing rail lines and are equipped with sensors integrated into NREL's Advanced Locomotive Technology and Rail Infrastructure Optimization System. The technology aims to reduce delivery times by almost 70%, minimize cargo buildup at freight terminals, and enable the construction of smaller, less expensive terminals in new locations with good rail access but limited space. The project targets increasing rail usage and reducing carbon pollution from trucking.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data