logo
ProjectEnded

AUTONOMOUS MULTI-ELECTRIC RECYCLING PROCESS LINE

Sector: Metal • Location: Italy

Source: EU Funding & Tenders Portal

Metal recycling has not experienced any significant progress since blade-based systems were implemented. This system involves downtimes every 8 hours to sharpen the blades and blade´s replacement every 24 working hours, high maintenance costs and, in many cases, metal recovery rates that barely reach 70%. Guidetti is an Italian company with more than 30 years of experience providing solutions to t

Status
Closed
Sector
Metal
Location
Italy
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about AUTONOMOUS MULTI-ELECTRIC RECYCLING PROCESS LINE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “AUTONOMOUS MULTI-ELECTRIC RECYCLING PROCESS LINE” is an infrastructure initiative in the Metal sector, located in Italy. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Metal recycling has not experienced any significant progress since blade-based systems were implemented. This system involves downtimes every 8 hours to sharpen the blades and blade´s replacement every 24 working hours, high maintenance costs and, in many cases, metal recovery rates that barely reach 70%. Guidetti is an Italian company with more than 30 years of experience providing solutions to the metal recycling sector. Thanks to the continuous feedback from our customers and the understanding of their needs, we have developed MRP: a new concept of metal recycling technology, that dispenses with the inefficient blades by high-durability hammers and centrifugal drums, that disintegrate the waste by collisions between waste particles, reaching recycling rates of 99 % with minimal wear on its components. MRP has been designed in the form of modules that overlap one another in tower-shape, decreasing the space requirements in the recycling facilities and also decreasing the energy consumption. MRP also incorporates a dust extraction system which avoids obstructions in the modules and reduces abrasion inside the drums and pipes. MRP, is not only a greater efficiency in terms of metal recovery but also in terms of maintenance (up to 10 times less maintenance costs), space requirements (MRP is a compact tower of 10x10x16(h)m), in personnel thanks to its fully automated process; saving in investment, being up to one third more economical requirement (only 2 operators need instead of 6-10). MRP points to be the benchmark of a market valued at more than € 220bn with a CAGR of 22%. The total investment needed to complete the project would be € 2.7million, which will be fast compensated according to our sales expectations. We have scheduled a start of MRP sales in 2021 and we have forecasted a 4-year ROI of 3.65 with € 15million of revenue and a total profit of € 5million.

Location

Country

Italy

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Metal

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project