Avaada 100 MW Solar Power Project in Vadodara
Sector: Solar • Location: Vadodara, Gujarat, India
Source: pv magazine International
Avaada Group's 100 MW solar power project in Vadodara district, Gujarat, spread over 350 acres, being developed by Avaada GJ Solar. The project is scheduled for commissioning by April 2026 and aims to provide renewable energy with environmental benefits including CO2 offset and water conservation.
- Status
- Under Construction
- Sector
- Solar, Water Supply and Storage, Power Generation (CCGT)
- Location
- Vadodara, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- pv magazine International
ConstructChat
Ask ConstructChat about Avaada 100 MW Solar Power Project in Vadodara
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Avaada Group's 100 MW solar power project in Vadodara district, Gujarat, spread over 350 acres, being developed by Avaada GJ Solar. The project is scheduled for commissioning by April 2026 and aims to provide renewable energy with environmental benefits including CO2 offset and water conservation. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Gujarat |
City | Vadodara |
Source
Source | pv magazine International |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2025-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
