logo

Avaada Group 280 MW Solar Power Plant

Sector: Solar • Location: Surendranagar, Gujarat, India

Source: pv magazine India

Project
Completed

Avaada Group's 280 MW solar power project located in Surendranagar district, Gujarat, spanning over 1,170 acres. The project uses ALMM-certified, Make-in-India TOPCon n-type bifacial solar PV modules and supplies electricity to Gujarat Urja Vikas Nigam Ltd (GUVNL).

Status
Closed
Sector
Solar, Power Generation (CCGT)
Location
Surendranagar, Gujarat, India
Updated
22 Jul 2026
Source
pv magazine India

ConstructChat

Ask ConstructChat about Avaada Group 280 MW Solar Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avaada Group 280 MW Solar Power Plant” is an infrastructure initiative in the Solar sector, located in Surendranagar, Gujarat, India. Taiyo aggregates data on it from pv magazine India.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Avaada Group's 280 MW solar power project located in Surendranagar district, Gujarat, spanning over 1,170 acres. The project uses ALMM-certified, Make-in-India TOPCon n-type bifacial solar PV modules and supplies electricity to Gujarat Urja Vikas Nigam Ltd (GUVNL).

Original sector

Energy

Budget

Location

Country

India

State

Gujarat

City

Surendranagar

Source

Source

pv magazine India

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project