logo
ProjectCompleted

Avaada Group 280 MW Solar Project

Sector: Water Supply and Storage • Location: Surendranagar, Gujarat, India

Source: ET Energy World

Avaada Group has commissioned a 280 MW solar power project in Surendranagar, Gujarat, spanning 1,170 acres across the villages of Tavi and Varsani. The project uses ALMM-certified Make in India TOPCon N-Type bifacial solar PV modules and supplies electricity to Gujarat Urja Vikas Nigam Limited (GUVNL). It aims to improve energy access and agricultural productivity, offset approximately 595,857 ton

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Solar, Raw Materials
Location
Surendranagar, Gujarat, India
Updated
22 Jul 2026
Source
ET Energy World

ConstructChat

Ask ConstructChat about Avaada Group 280 MW Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avaada Group 280 MW Solar Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Surendranagar, Gujarat, India. Taiyo aggregates data on it from ET Energy World.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Avaada Group has commissioned a 280 MW solar power project in Surendranagar, Gujarat, spanning 1,170 acres across the villages of Tavi and Varsani. The project uses ALMM-certified Make in India TOPCon N-Type bifacial solar PV modules and supplies electricity to Gujarat Urja Vikas Nigam Limited (GUVNL). It aims to improve energy access and agricultural productivity, offset approximately 595,857 tons of CO2 emissions annually, and conserve about 112 lakh litres of water per year using robotic module cleaning systems.

Original sector

Energy

Budget

Location

Country

India

State

Gujarat

City

Surendranagar

Source

Source

ET Energy World

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Solar, Raw Materials

Article published date

2025-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project