logo

AVAIO Digital Data Center in Rankin County

Sector: Solar • Location: Brandon, Mississippi, United States

Source: Vicksburg Post

Project
Planned

AVAIO Digital, a Connecticut-based company, plans to build a 600,000-square-foot data center in Rankin County, Mississippi. The $6-billion project is expected to be completed by 2027 and aims to bring over $20 million in annual tax revenue and create 60 direct jobs. The project has raised concerns among Brandon residents about environmental impact, water and power consumption, and pollution. AVAIO

Status
Prospective
Sector
Solar, Data Center, Water Supply and Storage, Power Generation (CCGT)
Location
Brandon, Mississippi, United States of America
Updated
22 Jul 2026
Source
Vicksburg Post

ConstructChat

Ask ConstructChat about AVAIO Digital Data Center in Rankin County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AVAIO Digital Data Center in Rankin County” is an infrastructure initiative in the Solar sector, located in Brandon, Mississippi, United States. Taiyo aggregates data on it from Vicksburg Post.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AVAIO Digital, a Connecticut-based company, plans to build a 600,000-square-foot data center in Rankin County, Mississippi. The $6-billion project is expected to be completed by 2027 and aims to bring over $20 million in annual tax revenue and create 60 direct jobs. The project has raised concerns among Brandon residents about environmental impact, water and power consumption, and pollution. AVAIO has promised sustainable design features including rainwater collection and solar panels to minimize power demands.

Original sector

Technology

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Brandon

Source

Source

Vicksburg Post

URL

More Details

Record type

Project

Sector

Solar, Data Center, Water Supply and Storage, Power Generation (CCGT)

Article published date

2025-12-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project