logo
ProjectPlanned

Avalon A1566HA Hydro-Cooled Mining Servers Deployment for Grid Balancing

One of 4,476 projects Taiyo tracks in Japan.

Source: Bitget

Canaan Inc. secured a 4.5-megawatt contract to deploy Avalon A1566HA hydro-cooled mining servers in Japan to provide real-time grid balancing and manage load fluctuations for a regional utility. The deployment is expected to be operational by the end of 2025.

Status
Prospective
Sector
Hydro, Power Transmission, Power Generation (CCGT)
Location
Japan
Updated
22 Jul 2026
Source
Bitget

ConstructChat

Ask ConstructChat about Avalon A1566HA Hydro-Cooled Mining Servers Deployment for Grid Balancing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Avalon A1566HA Hydro-Cooled Mining Servers Deployment for Grid Balancing” is an infrastructure initiative in the Hydro sector, located in Japan. Taiyo aggregates data on it from Bitget.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Canaan Inc. secured a 4.5-megawatt contract to deploy Avalon A1566HA hydro-cooled mining servers in Japan to provide real-time grid balancing and manage load fluctuations for a regional utility. The deployment is expected to be operational by the end of 2025.

Original sector

Energy

Location

Country

Japan

Source

Source

Bitget

URL

More Details

Record type

Project

Sector

Hydro, Power Transmission, Power Generation (CCGT)

Article published date

2025-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project