Avalon Talon Prairie Reconstruction
Closed · Illinois · Last reported Oct 2024
Source: Dodge USA
The work under this contract shall consist of removing the existing concrete pavement along Avalon Blvd. from Forsyth Pkwy. to 170 ft south of Ventura Dr. and removing the existing bituminous pavement at the intersection of Talon Ln. and Prairie Ln. and replacement of both pavements with hot mix asphalt on an aggregate base. This work will also include mountable curb replacement, replacement of mu
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Forsyth, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Avalon Talon Prairie Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work under this contract shall consist of removing the existing concrete pavement along Avalon Blvd. from Forsyth Pkwy. to 170 ft south of Ventura Dr. and removing the existing bituminous pavement at the intersection of Talon Ln. and Prairie Ln. and replacement of both pavements with hot mix asphalt on an aggregate base. This work will also include mountable curb replacement, replacement of multiple sidewalk ramps with ADA accessible ramps, a storm sewer inlet installation, adjusting inle... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Forsyth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
