logo
ProjectClosed

Avalon Talon Prairie Reconstruction

Closed · Illinois · Last reported Oct 2024

Source: Dodge USA

The work under this contract shall consist of removing the existing concrete pavement along Avalon Blvd. from Forsyth Pkwy. to 170 ft south of Ventura Dr. and removing the existing bituminous pavement at the intersection of Talon Ln. and Prairie Ln. and replacement of both pavements with hot mix asphalt on an aggregate base. This work will also include mountable curb replacement, replacement of mu

Status
Closed
Sector
Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
Location
Forsyth, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Avalon Talon Prairie Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avalon Talon Prairie Reconstruction” is an infrastructure initiative in the Cement sector, located in Forsyth, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work under this contract shall consist of removing the existing concrete pavement along Avalon Blvd. from Forsyth Pkwy. to 170 ft south of Ventura Dr. and removing the existing bituminous pavement at the intersection of Talon Ln. and Prairie Ln. and replacement of both pavements with hot mix asphalt on an aggregate base. This work will also include mountable curb replacement, replacement of multiple sidewalk ramps with ADA accessible ramps, a storm sewer inlet installation, adjusting inle...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Forsyth

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project