logo
ProjectUnder Construction

AVAX One Alberta AI Data Center Micro-Grid Project

Under construction · Alberta · Last reported Apr 2026

Source: Miami Herald

AVAX One Technology Ltd. is developing a 10-megawatt Tier 3-ready powered land site in Alberta, Canada, to provide reliable behind-the-meter power for AI and high-performance computing workloads. The project uses a modular micro-grid powered primarily by low-cost flared or stranded natural gas, including battery energy storage, grid backup, and diesel redundancy to meet strict uptime standards. It

Status
Under Construction
Sector
Natural Gas, Energy Storage, Power Generation (CCGT), Data Center
Location
Calgary, Alberta, Canada
Updated
22 Jul 2026
Source
Miami Herald

ConstructChat

Ask ConstructChat about AVAX One Alberta AI Data Center Micro-Grid Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AVAX One Alberta AI Data Center Micro-Grid Project” is an infrastructure initiative in the Natural Gas sector, located in Calgary, Alberta, Canada. Taiyo aggregates data on it from Miami Herald.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AVAX One Technology Ltd. is developing a 10-megawatt Tier 3-ready powered land site in Alberta, Canada, to provide reliable behind-the-meter power for AI and high-performance computing workloads. The project uses a modular micro-grid powered primarily by low-cost flared or stranded natural gas, including battery energy storage, grid backup, and diesel redundancy to meet strict uptime standards. It aims to capture flared natural gas to reduce emissions and generate carbon credits.

Original sector

Energy and Technology

Budget

Location

Country

Canada

State

Alberta

City

Calgary

Source

Source

Miami Herald

URL

More Details

Record type

Project

Sector

Natural Gas, Energy Storage, Power Generation (CCGT), Data Center

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project