Ave Maria University Central Utility Plant Capacity Expansion
Sector: Education • Location: Ave Maria, Florida, United States
Source: citybiz
Ameresco is developing a project to increase the central utility plant's capacity at Ave Maria University by more than 80% by adding a 3,000-ton chiller, boosting total capacity from 3,600 tons to 6,600 tons. This upgrade will ensure system redundancy and improved efficiency across the university's 17 facilities.
- Status
- Under Construction
- Sector
- Education, Power Transmission, Power Generation (CCGT)
- Location
- Ave Maria, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- citybiz
ConstructChat
Ask ConstructChat about Ave Maria University Central Utility Plant Capacity Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ameresco is developing a project to increase the central utility plant's capacity at Ave Maria University by more than 80% by adding a 3,000-ton chiller, boosting total capacity from 3,600 tons to 6,600 tons. This upgrade will ensure system redundancy and improved efficiency across the university's 17 facilities. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Florida |
City | Ave Maria |
Source
Source | citybiz |
URL |
More Details
Record type | Project |
Sector | Education, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
