Ave Maria University Central Utility Plant Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: TradingView
Ameresco plans to increase the central utility plant capacity at Ave Maria University by more than 80% by adding a 3,000-ton chiller to ensure system redundancy and efficiency across 17 facilities. This expansion is expected to be completed in 2026, signaling a continued and growing partnership.
- Status
- Prospective
- Sector
- Education, Power Transmission, Power Generation (CCGT)
- Location
- Ave Maria, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- TradingView
ConstructChat
Ask ConstructChat about Ave Maria University Central Utility Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ameresco plans to increase the central utility plant capacity at Ave Maria University by more than 80% by adding a 3,000-ton chiller to ensure system redundancy and efficiency across 17 facilities. This expansion is expected to be completed in 2026, signaling a continued and growing partnership. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Florida |
City | Ave Maria |
Source
Source | TradingView |
URL |
More Details
Record type | Project |
Sector | Education, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
