logo

Avenue 56 Grade Separation Project

Sector: Water Supply and Storage • Location: Corcoran, California, United States

Source: Mass Transit

Project
Completed

The Avenue 56 grade separation is the first high-speed rail structure to be completed in Tulare County, California. The 219-foot long overpass takes traffic over the future high-speed rail tracks and is comprised of 12 pre-cast concrete girders, 850 cubic yards of concrete, and 161,795 pounds of steel. The project also involved building berms to divert water and prevent flooding during heavy rains

Status
Closed
Sector
Water Supply and Storage, Commercial, Cement, Mass Transit, Steel, Metal, Rail, Government
Location
Corcoran, California, United States of America
Updated
22 Jul 2026
Source
Mass Transit

ConstructChat

Ask ConstructChat about Avenue 56 Grade Separation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avenue 56 Grade Separation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Corcoran, California, United States. Taiyo aggregates data on it from Mass Transit.

Participants

Sponsoring Agency

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Avenue 56 grade separation is the first high-speed rail structure to be completed in Tulare County, California. The 219-foot long overpass takes traffic over the future high-speed rail tracks and is comprised of 12 pre-cast concrete girders, 850 cubic yards of concrete, and 161,795 pounds of steel. The project also involved building berms to divert water and prevent flooding during heavy rains in 2023.

Original sector

Transportation

Location

Country

United States of America (USA)

State

California

City

Corcoran

Source

Source

Mass Transit

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Cement, Mass Transit, Steel, Metal, Rail, Government

Article published date

2025-06-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project