Avenue B Pavement Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The proposed pavement rehabilitation project consists in removing 6.75-Inches of the existing Asphalt Concrete (AC) pavement and base material by milling and rebuilding the pavement section with 6.75-Inches of AC pavement. The project includes improvements to water utility services, stormwater drainage facilities, repairs to the curbs and gutters as necessary at various locations throughout the pr
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Road, Government, Cement, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Automotive
- Location
- Yuma, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Avenue B Pavement Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed pavement rehabilitation project consists in removing 6.75-Inches of the existing Asphalt Concrete (AC) pavement and base material by milling and rebuilding the pavement section with 6.75-Inches of AC pavement. The project includes improvements to water utility services, stormwater drainage facilities, repairs to the curbs and gutters as necessary at various locations throughout the project. The project will improve sidewalks, sidewalk ramps and driveways at various locations to m... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Yuma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Road, Government, Cement, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
