logo
ProjectUnder Construction

Avenue N Bridge Replacement Project

The owner, status and timeline of this project. A free account opens every field.

Source: DailyTrib.com

The Avenue N bridge project involves constructing a new elevated bridge to replace the former low-water crossing over Backbone Creek, which was submerged during the October 2018 flood. The new bridge aims to provide a safer and more reliable route for residents of Marble Falls and Meadowlakes, especially during high-water events. Construction began in April 2025 and is nearing completion, with fin

Status
Under Construction
Sector
Water Supply and Storage, Bridge
Location
Marble Falls, Texas, United States of America
Updated
22 Jul 2026
Source
DailyTrib.com

ConstructChat

Ask ConstructChat about Avenue N Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avenue N Bridge Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Marble Falls, Texas, United States. Taiyo aggregates data on it from DailyTrib.com.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Avenue N bridge project involves constructing a new elevated bridge to replace the former low-water crossing over Backbone Creek, which was submerged during the October 2018 flood. The new bridge aims to provide a safer and more reliable route for residents of Marble Falls and Meadowlakes, especially during high-water events. Construction began in April 2025 and is nearing completion, with final tasks including painting, paving, and grading.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Texas

City

Marble Falls

Source

Source

DailyTrib.com

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge

Article published date

2026-07-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project