Aviator-Takeoff Transmission Project
Sector: Energy • Location: Fairfax, Virginia, United States
Source: ALXnow
A project in Fairfax and Loudoun counties involving a new Takeoff Substation with a new 230 kV line through 3.2 miles of new right of way. The project received State Corporation Commission approval in March 2025, with construction targeted to begin in late 2026.
- Status
- Prospective
- Sector
- Energy
- Location
- Fairfax, Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- ALXnow
ConstructChat
Ask ConstructChat about Aviator-Takeoff Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A project in Fairfax and Loudoun counties involving a new Takeoff Substation with a new 230 kV line through 3.2 miles of new right of way. The project received State Corporation Commission approval in March 2025, with construction targeted to begin in late 2026. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Virginia |
City | Fairfax |
Source
Source | ALXnow |
URL |
More Details
Record type | Project |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
