logo
ProjectPlanned

Aviator-Takeoff Transmission Project

Sector: Energy • Location: Fairfax, Virginia, United States

Source: ALXnow

A project in Fairfax and Loudoun counties involving a new Takeoff Substation with a new 230 kV line through 3.2 miles of new right of way. The project received State Corporation Commission approval in March 2025, with construction targeted to begin in late 2026.

Status
Prospective
Sector
Energy
Location
Fairfax, Virginia, United States of America
Updated
19 Nov 2026
Source
ALXnow

ConstructChat

Ask ConstructChat about Aviator-Takeoff Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Aviator-Takeoff Transmission Project” is an infrastructure initiative in the Energy sector, located in Fairfax, Virginia, United States. Taiyo aggregates data on it from ALXnow.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A project in Fairfax and Loudoun counties involving a new Takeoff Substation with a new 230 kV line through 3.2 miles of new right of way. The project received State Corporation Commission approval in March 2025, with construction targeted to begin in late 2026.

Original sector

Energy

Location

Country

United States of America (USA)

State

Virginia

City

Fairfax

Source

Source

ALXnow

URL

More Details

Record type

Project

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project