logo
ProjectOperational

Aviator Wind Facility

One of 10,000+ projects Taiyo tracks in Texas.

Source: Renewables Now

The Aviator Wind facility is a 525-MW wind farm located in Coke County, West Texas. It is one of the largest single-site wind farms in the United States, equipped with 191 wind turbines supplied by GE Vernova. The wind farm entered service in 2020 and has a generation capacity sufficient to power around 230,000 homes annually. The project is majority owned and operated by NorthStar Clean Energy, a

Status
Under Construction
Sector
Wind, Power Generation (CCGT), Power Transmission, Raw Materials
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Renewables Now

ConstructChat

Ask ConstructChat about Aviator Wind Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Aviator Wind Facility” is an infrastructure initiative in the Wind sector, located in Texas, USA. Taiyo aggregates data on it from Renewables Now.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Aviator Wind facility is a 525-MW wind farm located in Coke County, West Texas. It is one of the largest single-site wind farms in the United States, equipped with 191 wind turbines supplied by GE Vernova. The wind farm entered service in 2020 and has a generation capacity sufficient to power around 230,000 homes annually. The project is majority owned and operated by NorthStar Clean Energy, a subsidiary of US utility CMS Energy, with Japan's Kansai Electric Power as a minority partner.

Original sector

Renewable Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

Renewables Now

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Power Transmission, Raw Materials

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project