logo

Avion Parkway Data Center - Iw Building

Sector: Power Generation (CCGT) • Location: Chantilly, Virginia, United States of America

Source: Dodge

Project
Bid Results

The Scope Of Work Required For A New Iw Building. Work Includes Construction Of New Exterior And Interior Partitions, Finishes, Mechanical, Electrical, Plumbing & Fire Protection As Indicated On Drawings. The Drawings, In Concert With The Project Manual, Comprise The Contract Documents Outlining The Design intent And Project Scope, And May Be Supplemented By Further Information Issued By Architect

Status
Closed
Sector
Power Generation (CCGT), Stadium, Manufacturing (Industrial), Road, Data Center, Commercial
Location
Chantilly, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Avion Parkway Data Center - Iw Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avion Parkway Data Center - Iw Building” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Chantilly, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Scope Of Work Required For A New Iw Building. Work Includes Construction Of New Exterior And Interior Partitions, Finishes, Mechanical, Electrical, Plumbing & Fire Protection As Indicated On Drawings. The Drawings, In Concert With The Project Manual, Comprise The Contract Documents Outlining The Design intent And Project Scope, And May Be Supplemented By Further Information Issued By Architect. The Drawings Are Arranged In General To Specific Order, Following A Top To Bottom, Right To Lef...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Chantilly

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Stadium, Manufacturing (Industrial), Road, Data Center, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project