logo

Avista Utilities Capital Plan 2026-2030

Sector: Energy Storage • Location: Washington, United States

Source: AOL

Project
Planned

Avista Utilities plans capital expenditures of $615 million in 2026 and $3.4 billion from 2026 through 2030. There is potential incremental investment of up to $350 million for integrating a new large load customer, which is not included in the base capital plan. This integration would result in an 8% rate base growth above the base plan. The company is also advancing a battery energy storage proj

Status
Prospective
Sector
Energy Storage, Power Transmission, Power Generation (CCGT)
Location
Washington, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Avista Utilities Capital Plan 2026-2030

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Avista Utilities Capital Plan 2026-2030” is an infrastructure initiative in the Energy Storage sector, located in Washington, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Avista Utilities plans capital expenditures of $615 million in 2026 and $3.4 billion from 2026 through 2030. There is potential incremental investment of up to $350 million for integrating a new large load customer, which is not included in the base capital plan. This integration would result in an 8% rate base growth above the base plan. The company is also advancing a battery energy storage project targeted for commission in 2028 and is engaged in a four-year Washington rate case with a settlement conference scheduled for May 22, 2026.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Washington

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Energy Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project