logo

Avon to Gilman 115-kilovolt Transmission Line

One of 10,000+ projects Taiyo tracks in Colorado.

Source: VailDaily.com

Project
Proposed

Holy Cross Energy has proposed constructing a 115-kilovolt transmission line between the Gilman and Avon substations in Eagle County, Colorado. The project aims to create a redundant power loop to enhance reliability and capacity, reducing risks of electrical outages and accommodating increased demand due to population growth and electrification. The new route includes burying approximately 1.7 mi

Status
Prospective
Sector
Road, Power Generation (CCGT), Warehouse
Location
Avon and Gilman, Colorado, United States of America
Updated
22 Jul 2026
Source
VailDaily.com

ConstructChat

Ask ConstructChat about Avon to Gilman 115-kilovolt Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Avon to Gilman 115-kilovolt Transmission Line” is an infrastructure initiative in the Road sector, located in Avon and Gilman, Colorado, United States. Taiyo aggregates data on it from VailDaily.com.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Holy Cross Energy has proposed constructing a 115-kilovolt transmission line between the Gilman and Avon substations in Eagle County, Colorado. The project aims to create a redundant power loop to enhance reliability and capacity, reducing risks of electrical outages and accommodating increased demand due to population growth and electrification. The new route includes burying approximately 1.7 miles of the line to mitigate visual and environmental impacts.

Original sector

Energy

Location

Country

United States of America (USA)

State

Colorado

City

Avon and Gilman

Source

Source

VailDaily.com

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Warehouse

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project