logo

Ayanunga hydro plant

Sector: Hydro • Location: Peru

Source: World Bank Group

Project
Active

The project entails the development of a run-of-river hydropower plant with installed capacity of 20 MW. Once completed the plant will be able to generate over 130 GWh per year, equivalent to the annual consumption needs of over 105,000 Peruvian households. Enel, through its renewable energy subsidiary Enel Green Power Peru (EGPP), will build the Ayanunga hydro plant, located in the Monzón distric

Project Information FAQ

Project Information

4 Q
The project “Ayanunga hydro plant” is an infrastructure initiative in the Hydro sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the development of a run-of-river hydropower plant with installed capacity of 20 MW. Once completed the plant will be able to generate over 130 GWh per year, equivalent to the annual consumption needs of over 105,000 Peruvian households. Enel, through its renewable energy subsidiary Enel Green Power Peru (EGPP), will build the Ayanunga hydro plant, located in the Monzón district in the Peruvian region of Huánuco. The project is supported by a 20-year energy supply contract signed with Peru’s Ministry of Energy and Mines that was won in 2016 as par of a competitive bidding process based on lowest tariff (fourth public renewable energy tender launched by the Peruvian energy regulator OSINERGMIN.) Enel will be investing around $50 million in the construction of Ayanunga plant. Financing details are currently not available, but most likely Enel will fund the project with its own resources. Ayanunga is expected to enter into service by the end of 2018. https://corporate.enel.it/en/media/press/d201708-enel-starts-construction-of-ayanunga-hydro-plant-in-peru.html http://www.hydroworld.com/articles/2016/02/enel-enters-peru-with-20-mw-ayanunga-hydropower-plant.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data