Aydin–Denizli Wind Farm
Sector: Power Generation (CCGT) • Location: Turkey
Source: Renewables Now
Enercon has secured an order to supply 140 MW of wind turbines for the Aydin–Denizli project in Turkey. The project will use 20 E-175 EP5 E2 wind turbine units, each with a nominal power of 7.0 MW and a rotor diameter of 175 meters, installed on steel towers at hub heights of 112 meters. Construction is expected to start in April 2027, with commissioning planned for October 2027. Selected componen
- Status
- Prospective
- Sector
- Power Generation (CCGT), Raw Materials, Wind, Steel
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about Aydin–Denizli Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enercon has secured an order to supply 140 MW of wind turbines for the Aydin–Denizli project in Turkey. The project will use 20 E-175 EP5 E2 wind turbine units, each with a nominal power of 7.0 MW and a rotor diameter of 175 meters, installed on steel towers at hub heights of 112 meters. Construction is expected to start in April 2027, with commissioning planned for October 2027. Selected components of the new turbine model will be produced locally to meet tender requirements. |
Original sector | Renewable Energy |
Location
Country | Turkey |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Raw Materials, Wind, Steel |
Article published date | 2026-04-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
