logo

Ayen Aksu Wind Farm

Sector: Manufacturing (Industrial) • Location: Antalya, Turkey

Source: World Bank Group

Project
Active

Aksu Temiz Enerji was planning the development of the 72 MW Aksu wind farm, near Kayseri, Central Turkey. The project was to comprise 36 turbines of 2 MW, producing an annual 205 GWh. Aksu Temiz Enerji was a subsidiary of Ayen Enerji, owned by Aydiner Insaat. Ayen Enerji acquired 70% of Aksu Temiz Enerji early-2011. The project consisted of 36 turbines of 2MW each, producing 235GWh annually.

The

Status
Prospective
Sector
Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Antalya, Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ayen Aksu Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ayen Aksu Wind Farm” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Antalya, Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Aksu Temiz Enerji was planning the development of the 72 MW Aksu wind farm, near Kayseri, Central Turkey. The project was to comprise 36 turbines of 2 MW, producing an annual 205 GWh. Aksu Temiz Enerji was a subsidiary of Ayen Enerji, owned by Aydiner Insaat. Ayen Enerji acquired 70% of Aksu Temiz Enerji early-2011. The project consisted of 36 turbines of 2MW each, producing 235GWh annually. The project was expected for commissioning in late-2011. Equipment was to be supplied by Vestas, under a contract announced in May 2011. The developer received a 49 year production license in November 2007. Total costs were unkown as of October 2011. However, Turkish Industrial Development Bank TSKB agreed in May 2011 to finance EUR67 million ($89.1 million) in loans to Ayen Enerji for the project. Due to lack of data, total cost of $89.1 million was adopted here. The project was commissioned in March 2012.

Original sector

Energy

Budget

Location

Country

Turkey

State

Antalya

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project