Ayen Gumushane HPP
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Ayen Enerji was planning the development of the 70.8MW Gumushane hydropower plant, at Gumushane, Northeast Turkey. Ayen Enerji was owned by Aydiner Insaat.
Ayen Enerji received the rights to take over the licenses from state water authority DSI in March 2008. The project was commissioned in January 2012. In earlier notes, the plant was reported to be 48.8 MW, but at commissioning the project was
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ayen Gumushane HPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ayen Enerji was planning the development of the 70.8MW Gumushane hydropower plant, at Gumushane, Northeast Turkey. Ayen Enerji was owned by Aydiner Insaat. Ayen Enerji received the rights to take over the licenses from state water authority DSI in March 2008. The project was commissioned in January 2012. In earlier notes, the plant was reported to be 48.8 MW, but at commissioning the project was 70.8MW. Concessions in Turkey are typically 49 years, but the exact length for this contract was unknown. As of 2012, no further financial details were available. Total project cost was estimated at US$ 1.4 million, or US$ 99.1 million. Financial closure date was unknown but estimated at January 2012. http://www.bloomberg.com/news/2012-06-01/ayen-of-turkey-starts-operations-at-71-megawatt-hydro-plant.html |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
