logo
ProjectClosed

Ayeyarwady Integrated River Basin Management Project

Sector: Water Supply and Storage • Location: Myanmar

Source: World Bank Group

The objective of the Ayeyarwady Integrated River Basin Management Project for Myanmar is to strengthen integrated, climate resilient management and development of the Ayeyarwady River Basin and national water resources. There are four components to the project, the first component being water resource management institutions, decision support systems and capacity building. This component includes

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Seaport, Commercial, Hydro, Government
Location
Myanmar (Burma)
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ayeyarwady Integrated River Basin Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ayeyarwady Integrated River Basin Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Myanmar. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Ayeyarwady Integrated River Basin Management Project for Myanmar is to strengthen integrated, climate resilient management and development of the Ayeyarwady River Basin and national water resources. There are four components to the project, the first component being water resource management institutions, decision support systems and capacity building. This component includes four subcomponents: institutional component, Ayeyarwady River Basin Master Plan and Decision Support System, Preparation of Future Investments (PFI), and implementation support. The second component is the hydro-meteorological observation and information systems modernization. This component includes three subcomponents: institutional and regulatory strengthening, capacity building and implementation support, modernization of observation infrastructure, data management systems and forecasting, and enhancement of Hydromet service delivery systems. The third component is the navigation enhancement on the Ayeyarwady River. This component includes four subcomponents: navigation Improvements, navigation aids, water quality monitoring, and institutional strengthening and implementation support. Finally, the fourth component is the contingent emergency response. This ‘zero component’ (initially without any allocated funding) will allow for the rapid reallocation of funds from other components to provide emergency recovery and reconstruction support in the event of a natural disaster, emergency and/or catastrophic event. Funds potentially reallocated to component four will be disbursed either against a positive list of critical goods and/or against the procurement of works, and consultant services required to support the immediate response and recovery needs of the GoM. A contingent emergency response implementation plan will be developed to guide financial management, procurement, safeguard and any other necessary implementation arrangements and procedures.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Myanmar (Burma)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Seaport, Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project