Aysha Wind Power Project
The owner, status and timeline of this project. A free account opens every field.
Source: Capital Newspaper
The Aysha wind power project is a 300-megawatt wind farm located in the arid eastern desert of the Somali Region near the Djibouti border in Ethiopia. The project includes the design, construction, and long-term operation of the wind farm, a 5-kilometer transmission line, and upgrades to the existing Aysha II substation. It is developed, owned, and operated by AMEA Power, with Ethiopian Electric P
- Status
- Prospective
- Sector
- Power Generation (CCGT), Wind, Raw Materials
- Location
- Somali Region, Ethiopia
- Updated
- 22 Jul 2026
- Source
- Capital Newspaper
ConstructChat
Ask ConstructChat about Aysha Wind Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Aysha wind power project is a 300-megawatt wind farm located in the arid eastern desert of the Somali Region near the Djibouti border in Ethiopia. The project includes the design, construction, and long-term operation of the wind farm, a 5-kilometer transmission line, and upgrades to the existing Aysha II substation. It is developed, owned, and operated by AMEA Power, with Ethiopian Electric Power as the sole off-taker and owner of the transmission infrastructure under a 25-year Power Purchase Agreement. |
Original sector | Energy |
Budget |
Location
Country | Ethiopia |
State | Somali Region |
Source
Source | Capital Newspaper |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Raw Materials |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Coffee processing plant
- EIC- Children's Clothes
- New project on manufacturing of Pharmaceutical Products.
- Open for FDI through a minority stake/Establishment of an additional production facility of Edible oil/Purchase of new machinery and equipment/Right Edible Oil Processors Cooperatve society Plc.
- Production of Envelopes and Paper Bags
- Establishment of Refrigerator manufacturing plant
