Aysha Wind Project
Sector: Power Generation (CCGT) • Location: Aysha, Somali Region, Ethiopia
Source: Birr Metrics
The Aysha Wind Project is a 300-megawatt greenfield wind farm located near Aysha in the Somali Region of Ethiopia. It includes a five-kilometre transmission line and upgrades to the existing Aysha II substation. The project is Ethiopia's first privately developed wind power plant and the largest wind farm in the country, aiming to diversify the electricity generation mix and support universal elec
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind, Raw Materials
- Location
- Aysha, Somali Region, Ethiopia
- Updated
- 22 Jul 2026
- Source
- Birr Metrics
ConstructChat
Ask ConstructChat about Aysha Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Aysha Wind Project is a 300-megawatt greenfield wind farm located near Aysha in the Somali Region of Ethiopia. It includes a five-kilometre transmission line and upgrades to the existing Aysha II substation. The project is Ethiopia's first privately developed wind power plant and the largest wind farm in the country, aiming to diversify the electricity generation mix and support universal electricity access by 2030. |
Original sector | Energy |
Budget |
Location
Country | Ethiopia |
State | Somali Region |
City | Aysha |
Source
Source | Birr Metrics |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Raw Materials |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Coffee processing plant
- EIC- Children's Clothes
- New project on manufacturing of Pharmaceutical Products.
- Open for FDI through a minority stake/Establishment of an additional production facility of Edible oil/Purchase of new machinery and equipment/Right Edible Oil Processors Cooperatve society Plc.
- Production of Envelopes and Paper Bags
- Establishment of Refrigerator manufacturing plant
