logo

Ayyildiz Wind Farm

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Akenerji Elektrik Uterim A.S. [Turkey], a member of the Akkok Group, developed the 15MW Ayyildiz Wind Farm, near Bandirma in western Turkey. The project was developed on a greenfield, build own and operate (BOO) basis, and was awarded through a license scheme. Electricity generated by the wind farm was to be delivered to the Turkish national grid on a priority offtake basis.

Financial closure

Project Information FAQ

Project Information

4 Q
The project “Ayyildiz Wind Farm” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Akenerji Elektrik Uterim A.S. [Turkey], a member of the Akkok Group, developed the 15MW Ayyildiz Wind Farm, near Bandirma in western Turkey. The project was developed on a greenfield, build own and operate (BOO) basis, and was awarded through a license scheme. Electricity generated by the wind farm was to be delivered to the Turkish national grid on a priority offtake basis. Financial closure was reached in August 2009, when it was reported that the sponsor had finalized a EUR19.5 million (US$27.11 million) 10-year term loan from HSBC Bank. The loan was guaranteed by Danish export credit agency EKF, and was linked to the supply of Vestas [Denmark] wind turbines. The total project cost was EUR22.9 million (US$31.83 million), with the balance (EUR3.4million / US$4.7 million) funded by the sponsor’s equity contribution. In September 2009, it was reported that the wind farm was operational.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data