logo

AZ/DOT: Naranja Dr Multi Use Path Improvements

Sector: Metal • Location: Oro Valley, Arizona, United States of America

Source: Dodge

Project
Closed

The proposed project is located in the ADOT Southcentral District in the Town of Oro Valley within Pima County. The project limits are from La Ca ada Drive to First Ave along Naranja Drive. The work consists of constructing asphaltic concrete multi-use pathway, reconstructing side streets and driveways, culvert extensions, installing signs, constructing retaining walls, placing riprap, installing

Status
Closed
Sector
Metal, Car parking, Road, Cement, Automotive, Commercial
Location
Oro Valley, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about AZ/DOT: Naranja Dr Multi Use Path Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AZ/DOT: Naranja Dr Multi Use Path Improvements” is an infrastructure initiative in the Metal sector, located in Oro Valley, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is located in the ADOT Southcentral District in the Town of Oro Valley within Pima County. The project limits are from La Ca ada Drive to First Ave along Naranja Drive. The work consists of constructing asphaltic concrete multi-use pathway, reconstructing side streets and driveways, culvert extensions, installing signs, constructing retaining walls, placing riprap, installing metal handrails, pavement marking and other related work. Town Of Oro Valley (Naranja Dr La Canad...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Oro Valley

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Car parking, Road, Cement, Automotive, Commercial

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project