AZ/DOT: Pedestrian Facilities Improvement (T024201C)
Sector: Water Supply and Storage • Location: Apache Junction, Arizona, United States of America
Source: Dodge
The proposed work is located in the city of Apache Junction. The length of the project is 2.97 miles in total which includes work along Old West Highway, from Idaho Road on the west end to Goldfield Road on the east end of the project, and Winchester Road, from Broadway Avenue on the south end to Old West Highway on the north end. The work consists of constructing a new sidewalk along both sides o
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Road, Commercial, Waste Processing and Treatment, Rail, Car parking, Automotive
- Location
- Apache Junction, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about AZ/DOT: Pedestrian Facilities Improvement (T024201C)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work is located in the city of Apache Junction. The length of the project is 2.97 miles in total which includes work along Old West Highway, from Idaho Road on the west end to Goldfield Road on the east end of the project, and Winchester Road, from Broadway Avenue on the south end to Old West Highway on the north end. The work consists of constructing a new sidewalk along both sides of Old West Highway and on the west side of Winchester Road including sections that are attached w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Apache Junction |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Commercial, Waste Processing and Treatment, Rail, Car parking, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
